Bathroom Before:
Bathroom Currently:
Here is an update to the Bathroom To Do List post that I first posted way back in December, 2013.
Here's what we've done:
replace the piping with PEX tubingtake down shower doors & caulkingpatch walls where doors left gougespaint bathroom wallspaint linen cabinet & drawerspower-sand drawer fronts to get old handle marks offwax the drawers so they slide better & re-install all the handlestake down the grody hooks from the back of the doorbuy a shower curtain rodinstall shower curtain rod & hang up shower curtainsbuy a shower curtainbuy a shower curtain linerbuy & install the toilet paper holderbuy & install the hand towel ringbuy a floor mat & hand towel (registered for these!)buy a garbage can & tissue box coverbuy toothbrush holders for the medicine cabinetmake a little decorative curtain for the window, somewhere between this and this, but I think with a little tension rod instead of a wood block thingstain the window & window trimfrosted the window
And here's what's left:
- make & install towel/robe hooks
- buy a stainless steel shower caddy
- reglaze the cast iron tub
- make/buy art to hang up
recaulk the tub, tile,window crack, & sink edgesstrip paint off of window, window trim, door & the door trim- fix & stain the door & trim
- fix the pitch of the drains
No comments:
Post a Comment